Case Studies • Results

Each engagement follows a clear arc — Challenge → Solution → Result. Here are a few highlights.

Reduced network latency by 58% across 3 data centers.
Challenge
High inter-DC latency affecting real-time analytics.
Solution
Path optimization, Anycast routing, and L4/L7 load balancing.
Result
58% latency reduction and 22% higher pipeline throughput.
Achieved 99.999% uptime through hybrid architecture redesign.
Challenge
Single points of failure and noisy neighbor impacts in cloud.
Solution
Hybrid mesh design, multi-region failover, and autoscaling SLOs.
Result
Five-nines availability verified via SRE error budgets.
Automated 70% of monitoring tasks with rule-based workflows.
Challenge
Manual triage delaying incident response.
Solution
Anomaly detection, event correlation, and auto-remediation playbooks.
Result
70% automation, MTTR reduced by 43% across priority incidents.